This project consisted of the removal of 9,400 sf of concrete patio topping slab and membrane. A Triflex membrane system was installed on the structural slab and into the gutters. Concrete pavers with a pedestal system were installed as the new patio surface. Other work included painting the steel railings and applying stucco on the west and south sides. An iron-wood (ipe) trellis was installed along the 700-foot long railing.
S.D. Deacon
  Owner  
  One Carillon Point Association  
  Architect  
  Olympic Associates  