The discovery of extensive rot and decay at this five-story wood frame building resulted in an entire exterior envelope remediation to mend the damage; everything had to be repaired and, most commonly, replaced. The exterior walls, decks and roof were removed down to the frames, necessary repairs made and all envelope materials replaced with new product. All windows and doors were replaced and the decks were re-built from the wall out. Challenges with space limitations and an exceeding tight timeline for completion were successfully overcome through precise planning and collaboration between our team and the architects.
S.D. Deacon
  Owner  
  CDC Management Services for HOA  
  Architect  
  Soltner Group Architects  